Rubber dam punch a precision instrument having a rotating metal table disk with 6 holes of varying sizes and a tapered sharp pointed plunger plunger should be centered in the cutting hole avoid chipping of holes by plunger tip 12.
Rubber dam placement technique ppt.
The sheet is placed onto a metal frame to make it easier to place.
A tiny clamp is placed around the tooth itself to prevent the rubber dam from slipping and then the sheet with the hole in it is slipped around the clamp.
In most cases one of two placement techniques is routinely used.
The only danger is fracture of the rubber dam clamp.
There are a variety of rubber dam clamps out there but in this guide i m going to be using dr.
A simplified rubber dam technique for preparing teeth for indirect restorations grant a.
Rubber dam clamp and frame dam clamp and frame carried to mouth as one unit and placed clamp in place with four point contact and rubber tucked under the wings 20.
Forgive the minor audio miscues and enjoy the learning experience.
If this oc curs the elasticity of the dam will cause the fragments to be ejected from the patient s mouth.
Camera courtesy dr shihi.
Developed by sanford c.
The use of the rubber dam is vital to the successful completion of restorative dentistry in the pediatric patient.
Barnum in 1864 the rubber dam is considered the optimal method to isolate a dental operative field and to prevent moisture contamination during the placement of direct restorations and endodontic procedures.
Split dam technique indication insufficient coronal structure single fix prosthesis abutment tooth for bridge partially erupted tooth steps two overlapping holes are punched.
Basic step by step instructions for application and removal of the rubber dam are discussed in this chapter.
Ted as long as the final result correct placement of the rubber dam is achieved.
The dentist uses a hole puncher to make a hole in the sheet for the tooth or teeth to be treated.
Once it has been positioned in the mouth.
Brewer a correa me.
Calin pop s recommended clamps for proper isolation.
The effect of rubber dam placement on the arterial oxygen saturation in dental patients rhb goodday da crocker operative dentistry 2006 31 2 176 179 20.
The one step method in which the dam and clamp are placed simultaneously or the two step method in which the clamp is placed on the anchor tooth and the dam material is then stretched over the clamp.
Mcare dental dam sheet and gdc clamp used.